72h available · Fixed-scope quote

DETECT. REVIEW. PREVENT.

We review your construction docs before your contractor finds the problems.

We find conflicts, gaps, and coordination issues — then return them numbered, classified, and ready to fix before construction starts.

Sometimes you need a third party point of view to sharpen your own vision.
REDLINE OUTPUT Issue Register
Status Review Ready
12 Total Findings
03 High Risk
05 Suggested RFIs
ID Risk Discipline Finding Status
R-01 HIGH STRUC 24″ supply duct conflicts W24×76 beam at Level 2. No clearance possible at current routing. RFI
R-02 HIGH MEP 4″ sanitary line crosses steel beam elevation at restroom chase. Sleeve location not coordinated. Open
R-03 MED Scope Finish patching shown in architectural notes but missing from estimate scope and exclusions. Review
R-04 LOW Arch Door tag D-214 shown on plan but missing from door schedule. Note

WHY REDLINE

Most construction problems are visible before the field.

Drawings, scopes, estimates, and specifications often show the problem before construction starts. Redline turns those hidden risks into a clear technical action list.

Internal Review
Objectivity

Reviewed by the same team already inside the project.

Time

Done between meetings, deadlines, calls, and active site pressure.

Format

Comments stay scattered across emails, screenshots, and notes.

Risk

Issues are not always ranked by severity or urgency.

Scope

Gaps between drawings, estimates, and specs can stay hidden.

RedLine Markups
Objectivity

Independent second review focused only on finding issues.

Time

72-hour turnaround available for small review packages.

Format

Redlines, issue register, severity, RFIs, and next steps.

Risk

Findings are ranked as High, Medium, Low, or Informational.

Scope

Plans, scopes, estimates, specs, notes, and exclusions reviewed.

COST OF LATE ISSUES

The later you find the issue, the more expensive it becomes.

A missing dimension, scope gap, coordination conflict, or unclear detail is cheap to fix while it is still on paper. Once it reaches procurement, fabrication, field work, or rework, the cost multiplies.

Document Review
Estimating
Procurement
10×
Field Work
30×
Rework / Delay
100×
One high-severity issue caught early can recover the review fee. Most document sets contain multiple issues worth clarifying before construction.

SERVICES

Five reviews. Five ways to catch what others miss.

Redline Markups reviews the documents that usually create field problems: plans, scopes, estimates, coordination notes, and risk items.

01

Plan Markups

We mark the exact locations where information is missing, unclear, conflicting, or likely to cause field confusion.

Missing dimensions
Unclear details
Constructability notes
Suggested RFIs
02

Risk Detection

Every finding is classified by severity so the team knows what needs attention before procurement or construction.

High / Medium / Low
Cost-impact risks
Schedule risks
Action priority
03

Estimate Review

Quantity checks, assumptions, exclusions, and alignment between estimate and drawings.

04

Scope Review

Responsibilities, overlaps, exclusions, and unclear scope between owner, GC, and trades.

05

Coordination Review

Cross-discipline review across architectural, structural, MEP, civil, and specifications.

Need the full review scope?

See every review type, deliverable, and output included in a RedLine package.

View All Services →

PROCESS

From document upload to fixed-scope quote and report delivery.

Redline Markups follows a controlled workflow: receive the documents, check the scope, send a quote, begin after approval, and deliver a clear review package.

01

Send documents

Upload or email the plans, scopes, estimates, specifications, or reference files.

02

Scope check

We check document size, disciplines, complexity, review type, and deadline.

03

Quote approval

A fixed-scope quote is sent before review work begins.

04

Review begins

After approval, we review for conflicts, missing information, gaps, and risk items.

05

You receive the report

Your team receives redlined sheets, an issue register, suggested RFIs, severity levels, and recommended next steps.

View Full Process →

SAMPLE REPORT

See the issues before they become field problems.

The issue register is the main deliverable: every finding is numbered, classified, assigned to a discipline, and written as a clear action item.

Issue ID
Risk severity
Discipline tag
Recommended next action
View Sample Report →
PROJECT Construction Document Review
STATUS Review Complete
ISSUE REGISTER High-priority findings
ID Risk Finding
R-01 HIGH

24″ supply duct conflicts W24×76 beam at Level 2. No clearance possible.

R-02 HIGH

Sanitary line crosses beam elevation at restroom chase. Sleeve not coordinated.

R-03 MED

Finish patching shown in notes but excluded from estimate scope.

R-04 LOW

Door tag shown on plan but missing from schedule.

NEXT ACTION

Submit RFIs before procurement and confirm final detail coordination.

SHEET A-201 Redlined plan context
Sample RedLine reviewed construction sheet

REQUEST A QUOTE

Send the documents before the issue reaches the field.

Submit your project information first. Redline will review the document scope and send a fixed-scope quote before the review begins.

START HERE Request a document review quote.

Use the form below to send your project information.

Need to send drawings or large files?

Submit this form first, then email your PDF, DWG, ZIP, or full document package to review@redlinemarkups.com.