DOCUMENT REVIEW SERVICES
Five ways to catch problems before construction starts.
Redline Markups reviews construction documents before they become field problems: plans, scopes, estimates, coordination items, specifications, and risk gaps.
Redlined PDF set with issue locations marked directly on the sheets.
Issue register in PDF and Excel format when requested.
Suggested RFIs and coordination questions ready for the project team.
WHAT WE REVIEW
We focus on the documents that usually create field problems.
Redline Markups is an independent second review for AEC teams. The goal is to detect conflicts, gaps, unclear scope, missing information, and coordination risks before construction decisions are made.
The review does not replace the architect, engineer, contractor, or owner’s professional team. It gives them a clearer list of issues to resolve before procurement, coordination, or field work.
REVIEW TYPES
Choose the review type that fits the document risk.
Each service is quoted after reviewing document size, complexity, disciplines involved, review type, and requested deadline.
Plan Markups
Redlined plan review focused on missing information, unclear details, constructability questions, and sheet-level conflicts.
- Missing dimensions
- Unclear details
- Plan inconsistencies
- Suggested RFIs
Risk Detection
Review focused on finding high-impact issues that can create rework, delay, scope disputes, procurement problems, or field coordination conflicts.
- High / Medium / Low severity
- Cost-impact risks
- Schedule risks
- Priority action items
Coordination Review
Cross-discipline review across architectural, structural, MEP, civil, specifications, and notes.
- Trade conflicts
- MEP coordination issues
- Structural conflicts
- Specification mismatches
Estimate Review
Review of estimates against drawings, scopes, assumptions, exclusions, and quantities to detect pricing gaps before decisions are finalized.
- Quantity gaps
- Scope alignment
- Exclusion review
- Assumption checks
Scope Review
Review of responsibilities, exclusions, overlaps, and missing scope between owner, GC, subcontractors, trades, and estimate assumptions.
- Responsibility gaps
- Overlapping scopes
- Missing inclusions
- Contract risk items
PRICING
Pricing is quoted after reviewing the document scope.
Redline Markups provides fixed-scope pricing after reviewing the type of documents, number of sheets, review complexity, disciplines involved, and requested deadline.
Document Size
Pricing depends on the number of sheets, files, drawings, or pages included in the review package.
Review Type
Plan markups, risk detection, coordination review, estimate review, and scope review are quoted by depth.
Complexity
Multi-discipline packages, technical coordination, and high-risk document sets require deeper review time.
Deadline
Rush reviews or 72-hour turnaround requests may affect pricing depending on availability and document size.
Send one sheet first and see the RedLine review format before requesting a full package quote.
Request a Quote →DELIVERABLES
What you receive after the review.
Every review is organized so your team can track the issue, assign responsibility, and decide the next action.
Redlined PDF Set
Marked-up PDF drawings showing issue locations, comments, and coordination notes.
DWG Markups
DWG-based markup support when native files are provided and the scope requires it.
Issue Register PDF + Excel
Numbered issue list with severity, discipline, description, and recommended action.
Suggested RFIs
Clear questions your team can convert into RFIs, coordination notes, or meeting items.
Risk Summary
A high-level view of what requires priority attention before construction starts.
Recommended Next Steps
Action-oriented notes to help your team decide what to clarify, correct, or confirm.
REVIEW CONDITIONS
Simple scope. Fixed quote. Clear delivery.
Before any review work begins, the document set is checked and the scope is quoted.
Available turnaround
48-hour review may be available for small packages depending on size and complexity.
Fixed-scope pricing
A quote is sent before the review begins. No review starts without approval.
First sheet free
Send one sheet first and see the review format before requesting a full quote.
WHEN TO USE REDLINE
Use Redline before the document issue becomes a field issue.
Before bidding
Clarify risk before pricing is locked.
Before procurement
Catch missing information before material is ordered.
Before coordination
Find discipline conflicts before trade meetings.
Before construction
Reduce preventable RFIs, rework, and delays.
FAQ
Common service questions.
Do you design or stamp drawings?
No. Redline Markups provides independent document review and markup support, not sealed engineering or architectural design.
Can you review only one sheet?
Yes. The first sheet is free on your first project so you can see the review format before requesting a full quote.
How is pricing determined?
Pricing is quoted after reviewing document size, review type, complexity, disciplines, and requested deadline.
Can I send DWG or ZIP files?
Yes. Submit the form first, then email large files to review@redlinemarkups.com.
REQUEST A QUOTE
Send the documents before the issue reaches the field.
Submit your project information and receive a fixed-scope quote before the review begins.
