PROCESS

A clear document review process before construction starts.

RedLine Markups turns plans, scopes, estimates, specifications, and notes into a clear technical action list: redlines, issue register, severity levels, suggested RFIs, and recommended next steps.

PROCESS OUTPUT Documents → Scope check → Quote → Approval → Review → Report.
01

Send your documents or one sheet to start.

02

RedLine checks the scope and sends a fixed-scope quote.

03

The review begins only after quote approval.

HOW IT WORKS

Five steps. Clear quote. Controlled review.

RedLine follows a controlled workflow so your team knows what is being reviewed, what it will cost, and what will be delivered before any review work begins.

01

Send the documents

Upload or email plans, scopes, estimates, specifications, notes, or reference files.

02

Scope check

RedLine checks document size, disciplines, review type, complexity, and requested deadline.

03

Quote approval

A fixed-scope quote is sent before review work begins. The review starts only after approval.

04

Document review

The approved set is reviewed for conflicts, missing information, scope gaps, and risk items.

05

Report delivery

Your team receives redlined sheets, issue register, severity ranking, suggested RFIs, and next steps.

SEVERITY CLASSIFICATION

Every issue is ranked by urgency and impact.

Not every comment has the same weight. RedLine separates critical issues from general notes so your team knows what to solve first.

HIGH

Cost, schedule, or constructability risk

Issues that can create rework, delay, RFI dependency, field conflict, procurement risk, or major scope uncertainty.

MED

Coordination or scope clarification needed

Items that should be clarified before pricing, fabrication, trade coordination, or final document release.

LOW

Minor inconsistency or documentation note

Lower-impact items that still need cleanup, confirmation, or documentation alignment.

WHAT YOU RECEIVE

A review package your team can actually use.

The deliverable is not just comments on drawings. It is organized as a clear, trackable technical review package.

01

Redlined Sheets

Markups placed directly on the drawings so the issue location is easy to find.

02

Issue Register

A numbered list of findings with severity, discipline, description, and action.

03

Suggested RFIs

Clear question-style items your team can convert into RFIs or coordination notes.

04

Risk Summary

High-level summary showing which findings need priority attention.

REVIEW CONDITIONS

Simple scope. Fixed expectations.

Before the review starts, the document set and expected output are clarified so the scope is controlled and the timeline is realistic.

48h

Small-package turnaround

Available depending on document size, complexity, and schedule.

$

Fixed-scope quote

Pricing is confirmed before review work begins.

01

First sheet free

Send one sheet first to see the format before requesting a full quote.

PDF

File package

PDFs are preferred. DWG, ZIP, and full document packages can be sent by email.

WHAT TO SEND

The better the input, the better the review.

Send the files that define the construction intent. The review can include drawings, scope documents, estimates, specifications, schedules, or reference notes.

Architectural drawings
Structural drawings
MEP drawings
Civil drawings
Scopes of work
Cost estimates
Specifications
Reference notes

START YOUR REVIEW

Send your document set and receive a fixed-scope quote before the review begins.

RedLine checks the document scope first, then sends a clear quote before any review work starts.

Request a Quote →